What we do
We offer a wide range of innovative and fast speed mould manufacturing solutions for plastic parts.
- Rapid Tooling
- Production Moulds
- Two Shot (2K) Moulds
- Over Moulds
- Insert Moulds
- Automatic Unscrewing Moulds
- Low Volurne Production
- Over moulding
- Insert moulding
- Two-Shot (2K) Moulding
- Precision Injection Moulding
- High performance plastics(PEEK, PEI, PPS, LCP, PFA etc.)
Design & Engineering
Good moulds lies first in good design.
By researching along with domestic and international excellent peers, our design team are not only good at 2D, 3D products and mould design but also bring great value such as “efficient” and “innovation” as much as possible to our customers.
We attach great importance to the construction of the engineering team and can provide customers with product design, DFM analysis, Mold Flow, product modification and other works. Our mould design team is composed of more than 10 senior mould design elites with over ten years of mould design experience in the factory, and has the design ability to design more than 30 sets of complex moulds at the same time.
Be familiar with various design standards including: HASCO, DME, MISUMI, PUNCH and customer-specified standards, etc.
Mould Designing
DFM Analysis
Mould Flow Analysis
2D、 3D Mould Designing
Project Management
Our project team will make all their efforts by “Scheme + supervise + prevent + transmit”, to be sure that each project comes to a successful completion.
Scheme: concentrated on “quality” and “delivery”, we plan for each new project and each visit.
Supervise: next step after scheme is to supervise design, purchase, measurement, machining and testing.
Prevent: prevent against any possibly abnormal conditions.
Transmit: we will make conclusion for each project and transmit failure or successful experience to related link, to have better result by next project.


